prelab3 - ENGRI 115 Engineering Applications of OR Fall...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ENGRI 115 Engineering Applications of OR Fall 2007 The Critical Path Method (CPM) Prelab 3 Name: Objectives: Introduce the Critical Path Method for project scheduling as used in industry. Demonstrate the concept of sensitivity analysis. Practice formulation of network problems. Key Ideas: (directed) networks, paths in networks, longest and shortest path project scheduling, activities, critical activities sensitivity analysis Reading: DO NOT read section 8.4 in Winston, we will discuss the critical path method differently. Prelab Exercise: Please write your answer on the back of this sheet or an attached paper. You are the owner of Bill D. House Construction Company. You are interested in submitting a bid for the construction of a house in a nearby town, but first you want to figure out how long it will take you to build the house. After looking at the blueprints, you come up with the following estimates for the length of time necessary to complete each task involved in building the house:...
View Full Document

Page1 / 2

prelab3 - ENGRI 115 Engineering Applications of OR Fall...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online