Session 2 Operations Management 1   Operations management Session 2:  Process Management
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Session 2 Operations Management 2 Previous Class What are the key concepts learned in the last  session?
Background image of page 2
Session 2 Operations Management 3 “Measuring Performance in the  Services” What is the main point of the article? Why did I assign this article?
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Session 2 Operations Management 4 Class Objectives Process Measures (Capacity, Throughput Time,  WIP, Throughput Rate) Little’s Rule
Background image of page 4
Session 2 Operations Management 5 Process Improvement Raw Material Cook WIP Assemble Deliver Customer places order Patties cook in 45 seconds; the stove holds 20 patties. Assembly of a hamburger (including bun toasting) takes 15  seconds per hamburger. 10 workers are available to assemble hamburgers.
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Session 2 Operations Management 6 Analysis Cooking First 20 Second 20 Third 20 45 1:30 2:15 10 20 30 40 50 60 1:00 1:15 1:45 2:00 2:30 2:45 Assembly Suppose an order for 60 hamburgers is placed. How long will it take to complete this order?
Background image of page 6
Session 2 Operations Management 7 Bottleneck Analysis The stove, operating 100% of the time, can push out:  20  hamburgers / 45 seconds = 0.44 hamburgers per second. The workers, operating 100% of the time, can push out:  10  hamburgers / 15 seconds = 0.66 hamburgers per second. The stove is the  bottleneck  resource; it pushes out the  slowest amount of hamburgers per time period. There is no reason to hire another worker at any cost. Having an additional worker does not speed up the hamburger delivery process.
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Session 2 Operations Management 8 Capacity Definition:  The number of units, per unit of time,  that can be processed. Examples:   The capacity of the Macdonald’s in the previous example  was 0.44 hamburgers per second, or approximately 26  hamburgers per minute.   (Note:  Units are important!) A bank can serve 100 customers per day  The capacity of a server is 30000 hits per min.
Background image of page 8
Session 2 Operations Management 9 Calculating Capacity The capacity of a process is determined by the  slowest (bottleneck) resource.   To calculate the bottleneck resource, calculate the  amount of “stuff” each resource can push out per  unit time.  The bottleneck resource is the resource  that pushes out the least amount of “stuff” per unit  time. Question: Is it ever worthwhile to invest in additional capacity for non-bottleneck resources?
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Session 2 Operations Management 10 Throughput Time What is  Throughput time ?
Background image of page 10
Image of page 11
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 45

311_Session2 - Operations management Session 2: Process...

This preview shows document pages 1 - 11. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online