Lab 10 report - Erin Marek CE 301 Lab 10 Cut and Fill...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
rea of the 50-ft row using trapezoidal rule (all fill area) + + + wh2B2 h3 h4 h52 + . + . + . + . 6 254 662 4 3 3 81 2 432 Erin Marek 11/28/07 CE 301 Lab 10 Cut and Fill Calculations Introduction: This lab’s purpose was to show how to calculate the amount of space that would be filled or cut from a building site. It also showed how to calculate the shrinkage and swell factor as well as the price for removing soil or bringing soil in. Procedures: 1. Use the data from lab 9 for the elevations of each point in the footprint area. 2. Remembering that the 25-ft setback area’s elevation will be 2 feet below point A’s ground elevation, and that the building footprint’s elevation will be 2 feet above point A’s ground elevation, use the trapezoidal rule to find the area of the footprint that will be cut or filled. 3. Start with the first row of points at the 0 ft marker and determine the new elevation of each point taking the 2 feet rules in step 2 into account. Use the equation for the trapezoidal rule to find the area that needs to be cut or filled. 4.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 2

Lab 10 report - Erin Marek CE 301 Lab 10 Cut and Fill...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online