MGMT361 Spring 2017 Homework 2Due Wednesday February 8Section time:.Name:.Question 1 (3+4+4 = 11 points)Consider the following process. The capacity (units/hour) is given for each worker.a)Calculate the followingdesignparameters for this process:M390Stage 1Stage 2M160M236Cycle time (CT) for Stage 140sec / unitCT for Stage 237.5sec / unitBottleneckStage:2Process Designed CT40sec / unitProcess Capacity90units / hour
b)Customers arrive to this process in the following way: Every 60 seconecustomer arrives to M1:at time 0,60sec , 120sec, 180sec, … Every 120seconecustomer arrives to M2: at time 0, 120sec,240sec, 360sec,…Draw the Gantt chart from time 0 to time 300 sec. Each grid in the followingchart represents 10 sec. You can extend the below chart as needed.c)Under the arrival schedule given in (b), calculate the followingrun-timeparameters:Demand Rate90units/hourFlow Rate90units/hourActual Cycle Time40sec/unitWIP for M11unitsWIP for M20.83unitsWIP for Buffer0.17unitsWIP for M31unitsTotal3unitsM1M2BufferM3

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 5 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Spring
Professor
panwalker
Tags
Management, Skiing, M3 Half track, M2 Browning machine gun, M4 Sherman, Copenhagen Metro, M4 motorway

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture