hw-3a - Homework Set # 3 CE485, Spring 2006 Homework Due...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Homework Set # 3 Homework Due Time/Date: 12 Noon, 27 Feb 2006 CE485, Spring 2006 Student Name : ______________________________________________ (Note: Please attach this page to the front of your completed homework.) ____________________________________________________________________________________ hw-3.doc Page 1 of 1 2/19/2006 1. Program the attached chart in Excel for the analytical solution of the 1-D advection- dispersion equation. The equation to create the chart is written on the top of the chart. You can use the built-in ERFC function in excel to program the equation. Print the chart and print the spreadsheet and submit it as part of your homework. 2. Transit-time Design of Compacted Clay Liner Assume that you are a geoenvironmental engineering consultant who is an expert in landfill related projects. Your client, Allied Waste Services, has made a formal request to you to design a compacted clay liner (CCL) for a new cell of a hazardous waste landfill to be located north of Grand Rapids, Michigan. Assume that the regulatory requirements for the liner are a compacted clay liner having
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

hw-3a - Homework Set # 3 CE485, Spring 2006 Homework Due...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online