hw-4 - using HELP. In addition, once your design is...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Homework Set # 4 Homework Due Time/Date: 8:30 AM, 29 Mar CE485, Spring 2006 Student Name : ______________________________________________ (Note: Please attach this page to the front of your completed homework.) ____________________________________________________________________________________ hw-4 Page 1 of 1 3/21/2006 Instructor: Milind V. Khire, Ph.D., P.E. Leachate Collection System Design and Cost Estimation Part A: You have been given the responsibility to design the bottom leachate collection system (LCS) for Cell 4 of an MSW landfill located in Detroit, MI. Design the leachate collection system such that: 1. maximum leachate head on the liner does not exceed 30cm when the thickness of the waste is greater than 15 ft and less than 200 ft and the landfill is active (not closed); 2. Spacing between adjacent leachate collection pipes is 75 ft; 3. LCS drainage material has a hydraulic conductivity of 0.1 cm/s; and 4. Use the peak monthly impingement rate using minimum 30 year climatic data when
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: using HELP. In addition, once your design is complete, estimate the capital cost for the construction of the LCS. Assume that the dimensions of the cell are 200 m by 200 m (area = 1 acre). Use the following unit rates for estimating the cost. 1. Geotextile cushion layer to be placed on the geomembrane to protect the drainage material from damaging the geomembrane = $0.15/ft 2 2. LCS drainage material = $15/yd 3 as placed 3. LCS pipe (4 dia HDPE) = $2/ft installed 4. Cut/Fill the liner to slope the LCS: $5/m 2 for LCS slope < 5; $10/m 2 for LCS slope 5 and < 10; $20/m 2 for LCS slope 10 and < 30; and $25/m 2 for LCS slope 30 5. Ignore the cost of leachate sumps, riser pipes, and leachate pumps. Part B: Assume the landfill is located in Los Angeles, CA. How will it impact the capital cost of the LCS construction?...
View Full Document

This note was uploaded on 07/25/2008 for the course CE 485 taught by Professor Khire during the Spring '07 term at Michigan State University.

Ask a homework question - tutors are online