Dashboard 2016/Fall PMGT 540-90-2016/Fall 8 Unit 8 Quiz Question 1 Correct 1.00 points out of 1.00 Started on Monday, October 24, 2016, 7:20 PM State Finished Completed on Monday, October 24, 2016, 9:12 PM Time taken 1 hour 52 mins Grade 24.25 out of 25.00 ( 97 %) Which of the following are competing demands on a project? (Select all that apply) Select one or more: a. Scope b. Executives c. Time d. Resources e. Quality f. Risks g. Procurement h. Cost Your answer is correct. The correct answer is: Scope, Time, Cost, Quality, Resources, Risks
Image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Question 2 Correct 1.00 points out of 1.00 Question 3 Correct 1.00 points out of 1.00 Which of the following is not a potential project cost saving opportunity? Select one: a. Reassign to lower cost resources b. Shorten the project duration c. Add additional resources d. Find lower cost contracts e. Decrease the cost estimate Your answer is correct. The correct answer is: Add additional resources If Tasks A and B are both on the critical path and the duration of Task A is 4 days duration and the duration of Task B is 6 days, what will happen to the project schedule if either of them slip by two days? Select one: a. Project duration will increase by 2 days b. Project duration will decrease by 2 days c. We don't know d. Project total duration will increase by 3 days e. Project total duration will not change Your answer is correct. The correct answer is: Project duration will increase by 2 days
Image of page 2
Question 4 Correct 1.00 points out of 1.00 Question 5 Partially correct 0.25 points out of 1.00 The critical path for the network on page 261 of Wysocki is (durations are in the Right hand bottom corner of each box): Select one: a. A1-B1-B2-C3 b. A1-B1-A2-C3 c. A1-C1-C2-C3 d. A and B Your answer is correct. The correct answer is: A1-C1-C2-C3 What are some of the reasons could cause the critical path to become fragmented? (Select all that apply) Select one or more: a. Skill Set of Resources b. Unavailability of resources c. Workload Leveling d. Schedule constraints and deadlines
Image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern