Dashboard 2016/Fall PMGT 540-90-2016/Fall 10 Unit 10 Quiz Question 1 Correct 1.00 points out of 1.00 Started on Tuesday, November 8, 2016, 8:14 PM State Finished Completed on Tuesday, November 8, 2016, 8:35 PM Time taken 20 mins 34 secs Grade 25.00 out of 25.00 ( 100 %) Which of the following statements is correct about a project status that shows ahead of schedule and under budget? Select one: a. "greater than 1" CPI and "greater than 1" SPI b. "greater than 1" CPI and "less than 1" SPI c. "less than 1" CPI and "greater than 1" SPI d. "less than 1" CPI and "less than 1" SPI Your answer is correct. The correct answer is: "greater than 1" CPI and "greater than 1" SPI
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Question 2 Correct 1.00 points out of 1.00 Question 3 Correct 1.00 points out of 1.00 EAC stands for: Select one: a. Early Actual Costs b. Estimate at Completion c. Estimated Actual Costs d. Estimate to Complete Your answer is correct. The correct answer is: Estimate at Completion Which of the following formulas would you use for EAC if future costs are calculated based on a new cost estimate? Select one: a. EAC = BAC/CPI b. EAC = BAC/SPI c. EAC = BAC - CV d. EAC = AC + New Estimate for remaining Work Your answer is correct. The correct answer is: EAC = AC + New Estimate for remaining Work
Image of page 2
Question 4 Correct 1.00 points out of 1.00 Question 5 Correct 1.00 points out of 1.00 The Planned Value is 1000, the Actual Cost is 800, and the Earned Value is 700. Which of the following is true? Select one: a. Not enough information b. The project is ahead of schedule c. The project is on schedule d. The project is behind schedule Your answer is correct. The correct answer is: The project is behind schedule The Planned Value is 1000, the Actual Cost is 800, and the Earned Value is 700. Which of the following is true?
Image of page 3

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern