Tutorial Three solutions ACFI2003 2016 BB -...

This preview shows page 1 - 3 out of 6 pages.

The preview shows page 1 - 3 out of 6 pages.
Tutorial Three - Solutions9.22Plantwide versus Department Allocation: Munoz Sporting Equipment.BaseballBatsTennisracketsa.Sales revenue.....................................................$2,700,000$1,800,000Direct Labor.........................................................500,000250,000Direct Materials...................................................1,100,000550,000Overhead.............................................................1,000,000a500,000bProfit....................................................................$100,000$500,000$1,000,000 = $500,000 direct labor x 200%.$500,000 = $250,000 direct labor x 200%.b.Maria was wrong; Baseball bats were more profitable.BaseballBatsTennisracketsSales revenue.....................................................$2,700,000$1,800,000Direct Labor.........................................................500,000250,000Direct Materials...................................................1,100,000550,000Overhead.............................................................750,000a750,000bProfit....................................................................$350,000$250,000$750,000 = $500,000 direct labor x 150%.$750,000 = $250,000 direct labor x 300%.c.The plant-wide allocation method allocates overhead at 200% of direct labor for both types of equipment. While this is the simplest method, it is usually not very accurate. It assumes that overhead in both departments has the same rate. When overhead costs are broken down into department cost pools, we see that Department B is allocated a smaller share of the overhead. Each department should try to assess what causes its overhead, and use that as its allocation base.
9.23Plantwide versus Department Allocation: Main Street Ice Cream Company.StrawberryVanillaChocolatea.Direct Labor (per 1,000 gallons)..........................$750$825$1,125Raw Materials (per 1,000 gallons)......................800500600Overhead.............................................................    150a    165b    225cTotal cost (per 1,000 gallons)..............................$1,700$1,490$1,950a$150 = 50 labor-hours x $3 per hour.b$165 = 55 labor-hours x $3 per hour.c$225 = 75 labor-hours x $3 per hour.b.

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 6 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
One
Professor
N/A
Tags
Wired

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture