Post-Graduation Adventure - Week 2 - Post-Graduation Adventure Felicia Williams CPMGT\/305 Gary Denney POST GRADUATION ADVENTURE 2 Post-Graduation

Post-Graduation Adventure - Week 2 - Post-Graduation...

This preview shows page 1 - 4 out of 6 pages.

Post-Graduation Adventure Felicia Williams CPMGT/305 December 12, 2016 Gary Denney
Image of page 1
POST GRADUATION ADVENTURE 2 Post-Graduation Adventure Planning a trip abroad to South Africa or Vietnam could be an affordable adventure or a costly adventure. Mike and Josh will need to develop an WBS in order to systematically plot and plan their trip. I believe that a RM (responsibility matric) would also be a beneficial aspect of planning and insuring that the trip will fall within their limited budget and time frame. There may not be a best methodology that works for all business plans; there are ways to determine which methodology to use and how to effectively apply it. M. Alexandra (2015). 1.Assume you are either Mike or Josh; how would you go about making a decision using project management methodology?
Image of page 2
Image of page 3
Image of page 4

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture