esm223_05__Lecture_Notes_smallsize-pt2-rev

esm223_05__Lecture_Notes_smallsize-pt2-rev - Assessment of...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
21 Assessment of the Contamination • Determine in a very general manner: – Do immediate/interim measures have to be taken to reduce the risk of exposure or further contamination? – What are potential corrective actions? – What is the time-frame? – What are acceptable clean-up criteria (immediate and future)?
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
27 Site Assessment and Characterization • List of current and historical owners • Activities, past and present • Industrial and waste disposal sites • Regulatory agency files (e.g. SARA Title III reports, state agency) • Status of response Site-specific information to be obtained: 28 Site Assessment and Characterization • Terrain (historical and current maps, aerial photographs, land-use maps) • Meteorology (wind direction and speed, precipitation, temperatures) • Geologic and hydrologic data • Roads, rail and other accesses Site-specific information to be obtained:
Background image of page 2
29 Site Assessment and Characterization • Reported contamination or location of
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/06/2008 for the course ESM 235 taught by Professor Dunne during the Winter '08 term at UCSB.

Page1 / 5

esm223_05__Lecture_Notes_smallsize-pt2-rev - Assessment of...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online