Test 1 try 4 - DAU Page 1 of 5 Module 2 Exam Part I Here is your test result.The dots represent the choices you have made The highlighted questions are

Test 1 try 4 - DAU Page 1 of 5 Module 2 Exam Part I Here is...

This preview shows page 1 - 3 out of 5 pages.

Module 2 Exam, Part I Here is your test result.The dots represent the choices you have made. The highlighted questions are the questions you have missed. Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y' represents visited links. Back to Status page contains 20 Questions 1) The Test and Evaluation Master Plan (TEMP) links together, and must be consistent with, which of the following related program documents (Select all that apply)? [Recognize how the Test and Evaluation Master Plan (TEMP) generation, staffing and approval process integrates all functional disciplines throughout the acquisition life cycle.] [Remediation Accessed :N] Systems Engineering Management Plan (SEMP) Acquisition Program Baseline (APB) Initial Capabilities Document (ICD) Systems Threat Assessment (STA) 2) Which one of the following organizations would evaluate measures of effectiveness (MOEs) to determine how well a munitions system can perform its mission? [Identify the key T&E support organizations within DoD.] [Remediation Accessed :N] Marine Corps Operational Test and Evaluation Activity (MCOTEA) Marine Corps Systems Command (MARCORSYSCOM) Defense Contract Management Agency (DCMA) Joint Interoperability Test Command (JITC) 3) Which one of the following test and evaluation (T&E) products is required at Milestone B? [Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.] Identification of LRIP Quantities Operational Assessment No T&E products are required at MS B Waiver of Military Equipment Program Description 4) Operational Measures of Effectiveness (MOE) and Measures of Suitability (MOS) are formally documented in the ________. [Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.] Test and Evaluation Master Plan (TEMP) Page 1 of 5 DAU 4/25/2017
Image of page 1
Acquisition Strategy Initial Capabilities Document (ICD) Work Breakdown Structure (WBS)
Image of page 2
Image of page 3

You've reached the end of your free preview.

Want to read all 5 pages?

  • Fall '16
  • Integrated Product, acquisition strategy, Program Manager, acquisition program, Evaluation Master Plan

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture