GEO wall
ACE 2123/16/17Mr.LopezProject leaderProblem statementThe problem is we didn’t compress the sand enough, so when we test the GeoWall the reason why the tube started falls down is not because the Geo wal wasn’tstrong enough, is because we didn’t compress enough.
Objective----the goal of us, is to let the Geo wall hold 40 pounds in vertical, 25pounds in horizontal.Summary of solutionSo what we did to solve this problem is to add the sand one tier by tier(like every 2inch), for example, when we finish the first 2 inch, Yibin and Tone will startedcompress the sand and tone will step on the sand to compress more.Data max boxOutside: ()inch(long)*19.5inch(wide)*18.75inch(high)inside: ()inch(long)*18inch(wide)*18inch(high)
Qualtity of the sand.Volume of the sand
Weight of the sand.FindingWhat we find on the testWe find the different design will make the weigh that Geo wall can hold muchdifferent and how much we compress of the sand. For example, during the 3th testand the 4th

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 9 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Spring
Professor
e.q. peter
Tags
Project Management, Force, Mass, project leader

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture