HW #7 - Fahad Saleh Question #5 Analysis: Goldilocks should...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Fahad Saleh Question #5 Analysis: Goldilocks should spend 4.5 days in mine #1 and 3 days in mine #2. This would minimize the objective function to 7.5 days while satisfying all constraints.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Fahad Saleh Question #6 Analysis: Feed Co. should purchase 1000 lbs of wheat and 750 lbs of alfalfa to produce 1250 lbs of feed #1 and 550 lbs of feed #2. Feed #1 should be composed 80% of wheat and 20% of alfalfa while feed #2 should be composed entirely of alfalfa. This would fill the constraints and maximize Feed Co.’s profit at $1770.
Background image of page 2
Fahad Saleh Question #7 Analysis: Brady Corporation should purchase 27752 cubic feet of Grade 1 lumber, 39528 cubic feet of Grade 2 lumber and cut down 43748 cubic feet of logs. This would satisfy all constraints and minimize cost at $1,009,679.60. PLEASE SEE: The question is phrased awkwardly, so please pay close attention to my process (especially with respect to process #3 involving the log). I have interpreted the problem literally rather than intuitively. For example, the problem states, “Brady incurs
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/14/2008 for the course ENGRI 1101 taught by Professor Trotter during the Fall '05 term at Cornell University (Engineering School).

Page1 / 4

HW #7 - Fahad Saleh Question #5 Analysis: Goldilocks should...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online