MRPDRP Example

MRPDRP Example - W1 Shipment Forecast Sched Receipts...

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
W1 1 2 3 4 5 6 7 Shipment Forecast 100 120 150 130 100 120 70 Sched Receipts (Planned) On Hand 400 (Planned) Orders SS = 100 Order = 400 Lead time = 2 1 Gross Req'ts Sched Available (Planned) On Hand 600 Production Start SS = 100 Lot Size = 600 Lead time = 1 FRAME 1 2 3 4 5 6 7 Gross Req'ts Sched Available (Planned) On Hand 800 Production Start SS = 100 Lot Size = 600 Lead time = 2
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
W2 8 1 2 3 4 5 90 Shipment Forecast 40 50 60 90 70 Sched Receipts (Planned) On Hand 200 (Planned) Orders SS = 50 Order = 150 Lead time = 1 BICYCLE PLANT 2 3 4 5 6 7 8 WHEELS 8 1 2 3 4 5 Gross Req'ts Sched Available (Planned) On Hand 1400 Production Start SS = 100 Lot Size = 1200 Lead time = 1
Background image of page 2
6 7 8 100 40 30 6 7 8
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
W1 1 2 3 4 5 6 7 Shipment Forecast 100 120 150 130 100 120 70 Sched Receipts 400 400 (Planned) On Hand 400 300 180 430 300 200 480 410 (Planned) Orders SS = 100 Order = 400
Background image of page 4
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 6
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/24/2008 for the course SCM 345 taught by Professor Maltz during the Spring '08 term at ASU.

Page1 / 6

MRPDRP Example - W1 Shipment Forecast Sched Receipts...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online