ACME Development Corporation (ADC) Group Project

ACME Development Corporation (ADC) Group Project - Running...

Info icon This preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
Running head: GROUP PROJECT 1 Group Project: Requirements and Risks Name Institution Course Instructor Date
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
GROUP PROJECT 2 Part 1: Risk Template Among the aspects as a group that we found due to the requirement and risks assessments includes scheduling risks, external risks, internal risks, and product risks as well. the risks are articulated in the Risk Template as shown below: Product Risks: Risk Probabilit y Suppositions Reactions The scheduling tool is likely not to have all the expected aspects by ACME Development Corporation (ADC) 0.3 Each aspect need to be included to meet the requirements of ACME Development Corporation (ADC) Testing the Scheduling tool application or software before settling 50 percent of the balance towards delivery The scheduling tool may not be utilized by ACME Development Corporation (ADC) personnel due to the aspect that it is different from the one utilized earlier 0.6 ACME Development Corporation (ADC) personnel do not buy in or embrace change due to the product and are set on their own ways. Motivating ADC personnel regarding scheduling tool change through the provision of internet based training module. The scheduling tool bugs 0.2 Scheduling tool bugs will affect the software’s performance and efficiency The infection of the software by the bugs would result to a penalty of about $25,000 ACME Development Corporation (ADC)does not have the legal license of using the software 0.1 Licensing is necessary in obtaining additional authorities where programs especially the software utilization in the making of ADC scheduling tool. There should be a conventional law that gives the seller the authority based on licensure of the tool thus allocating the rights once ADC purchase the
Image of page 2
GROUP PROJECT 3 tool.
Image of page 3

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
GROUP PROJECT 4 Scheduling Risks: Risk Probabilit y Supposition Reaction The expected scheduling tool will not be accomplished within time limit 3/10 The seller would be accountable for the scheduling tool formulation. Considering firm clauses including an incentive and agreement penalization Scheduling tool is below the set standards 2/10 The vendor could avoid including various issues in the scheduling tool to reduce costs Stipulating the lowest acceptable standards needed for vendors to be paid or reimbursed Expense over-runs 4/10 Vendor’s responsibility is the additional expenses towards the completion of the project Obtaining a fixed agreement over price where the vendor has no means or ways of increasing the scheduling tool.
Image of page 4
GROUP PROJECT 5 External Risks: Risk Probabilit y Suppositions Reaction ACME Development Corporation personnel does not to have an access to the scheduling tool outside the corporation due to connection issues 0.3 ACME Development Corporation personnel need to access the tool through the internet Downloading the scheduling tool in personnel devices and accessed from any location or place Claims based on licensure infringement due to the utilization of the scheduling tool 0.05 The Agreements allows ACME Development Corporation (ADC) to use the scheduling tool.
Image of page 5

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern