Solution to Assignment 3 (1) - Department of Civil...

Info icon This preview shows pages 1–7. Sign up to view the full content.

View Full Document Right Arrow Icon
Department of Civil Engineering. Amin Rafiei North Carolina State University. CE342: Geotechnical Engg. Solution to Assignment-3 A_5_ Flow _1D Solution to Problem 1. Using the scaled we can get elevation head at all six points: Now we can calculate the total heads at points A and F: Because there is no total head loss as water moves from point A to point B and again from point D to point F, we know total head (and, thus pressure head) at points E, B and D:
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon