ops cheet sheet midterm 2

ops cheet sheet midterm 2 - Total Uptime Last demand prod....

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Total Uptime Last demand prod. Percentage Uptime = Rotation Cycle Time Q TC = h + K + c 2 Q if a level plan with no stock-out is used max demand prod if a level plan with stock-out is used Part b) Zero Inventory Plan Month # 1 1 2 3 Month # 1 1 2 3 Forcasted Demand 4 550 300 650 Forcasted Demand 3 550 300 650 Beginning Inventory 3 100 0 0 Beginning Inventory 4 100 0 0 Net Demand Production 6 450 300 650 Part b) Plan Units Net Demand /Worker 5=(3)-(4) 6 450 150 300 150 650 150 5=(4)-(3) 450 300 650 Units /Worker 7 150 150 150 # workers 7 3 2 5 10 Required 8=(6)4(7) 3 2 5 Production 8 = (7)4(6) 450 300 750 Workers Have 9 3 3 2 Ending Inventory 7 =(6)-(5) 0 0 100 100 Hired/ (Fired) 10= (8)-(9) 0 -1 3 ...
View Full Document

This note was uploaded on 09/30/2008 for the course MGMTSC 331 taught by Professor Baki during the Winter '08 term at Windsor.

Ask a homework question - tutors are online