Kill Sheet - Vertical Well.pdf - PAGE 1 OF 2 International Well Control Forum DATE Surface BOP Vertical Well Kill Sheet(Field Units NAME FORMATION

Kill Sheet - Vertical Well.pdf - PAGE 1 OF 2 International...

This preview shows page 1 - 2 out of 2 pages.

PAGE 1 OF 2 International Well Control Forum Surface BOP Vertical Well Kill Sheet (Field Units) DATE : _______________________ NAME : _______________________ FORMATION STRENGTH DATA: SURFACE LEAK-OFF PRESSURE FROM FORMATION STRENGTH TEST psi DRILLING FLUID DENSITY AT TEST ppg MAXIMUM ALLOWABLE DRILLING FLUID DENSITY = (A) (B) + = ppg SHOE T.V. DEPTH x 0.052 INITIAL MAASP = ((C) – CURRENT DENSITY) x SHOE T.V DEPTH x 0.052 = psi (A) (B) (C) PUMP NO. 1 DISPL PUMP NO. 2 DISPL bbls/stroke bbls/stroke SLOW PUMP RATE DATA: PUMP NO. 2 PUMP NO. 1 (PL) DYNAMIC PRESSURE LOSS (psi) SPM PRE-RECORDED VOLUME DATA: DRILL PIPE LENGTH feet CAPACITY bbls/ft VOLUME barrels TIME minutes PUMP STROKES strokes HEAVY WALL DRILL PIPE DRILL COLLARS x = x = + x = + DRILL STRING VOLUME (D) bbls VOLUME DISPLACEMENT PUMP STROKES SLOW PUMP RATE (E) strokes Min DC x OPEN HOLE DP / HWDP x OPEN HOLE x = x = + (F) bbls DP x CASING x = (G) + TOTAL ANNULUS VOLUME (F+G) = (H) bbls TOTAL WELL SYSTEM VOLUME (D+H) = (I) bbls ACTIVE SURFACE VOLUME (J) bbls TOTAL ACTIVE FLUID SYSTEM (I+J) bbls strokes strokes strokes strokes strokes strokes Min Min Min Min
Image of page 1
Image of page 2

You've reached the end of your free preview.

Want to read both pages?

  • Summer '17

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes