sample midterm acc solution

sample midterm acc solution - Answers to Sample Mid Term...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Answers to Sample Mid Term Exam Part I Answers 2 marks per question 1 A 2 D 3 D 4 C 5 A 6 A 7 C 8 D 9 D 10 B 11 B 12 A 13 A 14 D 15 B 16 C 17 B 18 B 19 C 20 B 21 B 22 D 23 C 24 D 25 B 26 B 27 B 28 D 29 B 30 D 31 C 32 C
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Part 2 Question 1: MARKS (a.) Department A predetermined overhead rate: Estimated overhead cost/Estimated machine-hours = $420,000/70,000 = $6.00 2 Department B predetermined overhead rate: stimated overhead cost/Estimated direct materials cost = $705,000/$282,000 = 250% of direct materials cost 2 (b.) Overhead applied to Job 243: Department A: 250 x $6.00 =$1,500 1 Department B: $1,100 x 2.5 =$2,750 1 $4,250 ====== (c.) Department B Manufacturing overhead incurred $705,000 1 Manufacturing overhead applied: $284,000 X 250% = 710,000 1 overapplied overhead $ (5,000) 1 ====== 9
Background image of page 2
Question 2: a.) Total overhead cost at 80,000 machine hours $262,400 Less: Utilities ($54,000 ÷ 50,000) x 80,000 86,400 Supervisory salaries (fixed) 62,000 Portion of overhead for June that represents maintenance
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 10/12/2008 for the course BUSI 1002 taught by Professor Dontknow during the Spring '08 term at Carleton CA.

Page1 / 4

sample midterm acc solution - Answers to Sample Mid Term...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online