Case 9 System Design Project Management

Case 9 System Design Project Management - Math Programming...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Math Programming Solution of case Task Number Task Name Task time Predecessor 1 Site approval 28 - 2 Site excavation 14 1 3 Place and secure ga 21 2 4 Install gas pumps 7 3 5 Connect and test ga 5 4 6 Construct service ar 14 2 7 Install and connect w 20 6 8 Test compressor 5 7 9 Construct main build 35 2 10 Install plumbing and 25 9 11 Cover tanks and sur 30 5, 7, 10 12 Clean site 15 11 13 Erect station signs 7 11 Task start time finish time task time expediting max expedite 1 0 28 28 0 0 2 28 42 14 0 4 3 42 63 21 0 0 4 63 70 7 0 0 5 70 75 5 0 0 6 42 56 14 0 7 7 56 76 20 0 0 8 76 81 5 0 0 9 42 77 35 0 10 10 77 102 25 0 9 11 102 132 30 0 0 12 132 147 15 0 7 13 132 139 7 0 0 147 contract - cost = 200000 early bonus 0 late penalty 148162.07 TOTAL OBJ = 51837.93
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Task Number Task Name Task Duration (days) 1 Preliminary System Description 40 2 Develop Specifications 100 3 Client Approval 50 4 Develop I/O Summary 60 5 Develop Alarm List 40 6 Develop Log Formats 40 7 Software Definition 35 8 Hardware Requirements 35 9 Finalize I/O Summary 60
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 5

Case 9 System Design Project Management - Math Programming...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online