RUNNING HEAD: PROJECT ISSUES 1 The Issues encountered with our project Excelsior College At the beginning of the project we layed down a plan in order to monitor our sections of the project to keep them on track. We have three sections that we will discuss in this paper called research, verification, and installing hardware. We expected some risks with this project
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
PROJECT ISSUES 2 and have outweighed them with gains. One of our major risks was the new hardware being compatible with the current network. So we will analyze this one major risk and its potential impact to the scope of the project. Three of our monitoring methods will be detailed in how we employ these tactics to track the different elements to our project. And lastly, we will discuss one thing that went wrong and how it altered the course of our project. Due to our business being fairly new, we purchased some lower end network switches and routers to keep startup costs low. This has worked out extremely well with our expectations. Now that we are expanding we discovered that Cisco has discontinued the current LAN hardware line that we are using. Now we are risking the new equipment not being compatible with the hardware currently in place. This can cause budget issues because we are already committed to the project and money has already been spent. Worst case scenario we would have to upgrade the entire LAN just to ensure everything works. The issues lies within the logical portion of the network and not the physical. The different routing and switching protocols in the routers is what is posing the threat. Although everything is connected, they information will not flow freely due to this potential problem. If this found out to be true, then this will cause major delays in the project. We then would have to put in another purchase order for all new LAN equipment for the rest of the network exceeding our budget by thousands. This is what
Image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern