MASSACHUSETTS INSTITUTE OF TECHNOLOGY CIVIL AND ENVIRONMENTAL ENGINEERING DEPARTMENT CENTER FOR CONSTRUCTION RESEARCH AND EDUCATION CENTER FOR CONSTRUCTION RESEARCH AND EDUCATION 1.040/1.401 S YSTEM P ROJECT M ANAGEMENT S PRING 2004 T ERM P ROJECT P HASE 4: F INAL R EPORT DUE: M AY 10, 2004 CIVIL AND ENVIRONMENTAL ENGINEERING DEPARTMENT MASSACHUSETTS INSTITUTE OF TECHNOLOGY
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
1.040/1.401 System & Project Management Spring 2004 Term Project Phase 4 I. R EPORT You are responsible for developing a case study of the project assigned to your group on the term project 2. This case study should be developed in such a way that a person not familiar with the project could obtain a clear understanding of the project in general terms of the evaluation, organization, planning, monitoring, control and learning processes. Please note that you should also identify a situation for each phase (evaluation, organization, planning,
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 10/29/2008 for the course PM 1040 taught by Professor Dr.nathanielosgood during the Spring '04 term at MIT.

Page1 / 2

tp4 - MASSACHUSETTS INSTITUTE OF TECHNOLOGY CIVIL AND...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online