EE_387_200809FA_home - EE 387 Homework 02 Fall 2008 Due on Thur Sept 11 at the EE Homework Slot outside of 121 EE East before 4:30 p.m 1 Derive the

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: EE 387 Homework 02 Fall 2008 Due on Thur. Sept. 11 at the EE Homework Slot outside of 121 EE East before 4:30 p.m. 1. Derive the phase admittance matrix for the floating wye-connected load on Slide 15 of the “polyphase networks” lecture notes by simplify the phase admittance matrix for the grounded wye on Slide 14. 2. Derive the phase admittance matrix for the floating wye-connected load on Slide 15 of the “polyphase networks” lecture notes by applying the technique used to derive the phase admittance matrix for the grounded wye. 3. A 345-kV, 3-phase transmission line delivers 100 MVA, 0.866 lagging, to a wye- connected load. Calculate the following: a. The total real and reactive power delivered to the load. b. The real and reactive power per phase. c. The phase voltages. d. The phase currents. e. The phase impedances. f. The line currents. 4. Repeat Problem 3 for a delta-connected load....
View Full Document

This note was uploaded on 11/11/2008 for the course EE 387 taught by Professor Jefferymayer during the Fall '08 term at Pennsylvania State University, University Park.

Page1 / 2

EE_387_200809FA_home - EE 387 Homework 02 Fall 2008 Due on Thur Sept 11 at the EE Homework Slot outside of 121 EE East before 4:30 p.m 1 Derive the

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online