3310solmod08

3310solmod08 - Module 8 Answers 4-25. (20 min.)...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Module 8 Answers 4-25. (20 min.) Interpretation of Regression Results—Multiple Choice: Cortez Company. a. (3) R 2 = .848 (84.8%), the explanation of variation in Y from the X regressor. b. (1) $370,000. The equation resulting from this regression analysis is Total overhead = Estimated fixed cost + estimated variable cost per labor-hour x labor- hours = Intercept estimate + Coefficient estimate on independent variable x 50,000 DLH = $120,000 + $5 x 50,000 DLH = $120,000 + $250,000 = $370,000 c. (2) $82 Total labor-hours = Total direct labor costs ÷ Direct labor wage rate = $640,000 ÷ $16 per hour = 40,000 direct labor-hours Labor-hours per unit = Total labor hours ÷ Total units = 40,000 ÷ 20,000 = 2 labor-hours per unit Total variable cost per unit = Direct materials + Direct labor + Variable overhead = ($800,000 ÷ 20,000) + ($640,000 ÷ 20,000) + $5 x 2 labor-hours = $40 + $32 + $5 x 2 labor-hours = $82 d. (4) $14 Contribution-margin per unit = Price – variable cost per unit
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/13/2008 for the course ACCT 305 taught by Professor Franz during the Spring '07 term at S.F. State.

Page1 / 6

3310solmod08 - Module 8 Answers 4-25. (20 min.)...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online