CE 460 ( Construction Contracting) Chap. 4 Professor Henry M. Koffman
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Chapter 4 2 CE 460 : Construction Contracting Chapter 4 Drawing and Specification
Background image of page 2
Chapter 4 3 CE 460 : Construction Contracting Architect - Engineer Organization, person, firm, or team that performs the project design Design Manage In-house Capability Architect-Engineer Owner- Client Design- Construct Construction Management
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Chapter 4 4 CE 460 : Construction Contracting Selection and Services Selection of the architect-engineer Call for submissions from interested designers Call for submissions that include designation of fees Call for bids for professional services      Services provided by the architect-engineer Developing the design, preparing the several documents for contractor     bidding or negotiation, and estimating the final cost Full construction-phase services : inspection, checking the shop drawings,     approval of periodic payments and the issuance of a certificate of completion     
Background image of page 4
Chapter 4 5 CE 460 : Construction Contracting Contractor input into design and Fee Contractor input into design General site planning, local work practice, labor availability and costs,     material availability, delivery time alternative work method       Fee for design service Percentage of construction cost Multiple of salary cost Multiple of salary cost plus nonsalary expense Fixed lump-sum fee Total expense plus professional fee Hourly or per diem charge     
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Chapter 4 6 CE 460 : Construction Contracting Responsibility and Liability Responsibility to the owner Has a fiduciary obligation to its client, requiring fairness, trust and loyalty Excise care and diligence in carrying out its responsibility 
Background image of page 6
Image of page 7
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/21/2009 for the course CE 460 taught by Professor Koffman during the Spring '08 term at USC.

Page1 / 15

CE 460 Chapter 4 - CE 460 ( Construction Contracting) Chap....

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online