    CE 460 Lecture Chapters 5  Cost Estimating and Bidding
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    Cost Estimating – Chapter 5 Construction estimating is the  compilation and analysis of the  many items that influence and  contribute to the cost of a project.
Background image of page 2
    Fixed-Price Estimates Lump Sum Unit Price Cost Plus
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    Preliminary Estimates An Approximation of Cost Cost-per-Function Square Foot Modular Takeoff Partial Takeoff Panel Unit Cost Parameter Cost
Background image of page 4
    Bidding Public Private
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    “Set – Asides” Only certain contractors are qualified to  bid, sometimes portions of a job are set  aside for those contractors
Background image of page 6
    Jobsite Visit Important for early detection of  errors and omission in the Bid Set  of Plans and Specs.
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    Job Site Observations Location Weather Utilities Available Local Ordinances Access Condition of adjacent site More on pg 88 of book
Background image of page 8
    Area Construction Practices Local Work Practices and Jurisdiction Labor Costs, Productivity, and  Availability Locally Favored Methods and Materials Key Local Practices Local (Sub) Contractors Establishment of Project Field Office
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    Step 1: “Take-offs” – Detailed quantity of  each work item
Background image of page 10
Image of page 11
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/21/2009 for the course CE 460 taught by Professor Koffman during the Spring '08 term at USC.

Page1 / 29

CE 460 Chapter 5 - CE 460 Lecture Chapters 5 Cost...

This preview shows document pages 1 - 11. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online