{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

tb chap 6 - 1 In process costing in a multi-department...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
1. In process costing in a multi-department setting: a. goods are rarely transferred from other departments. b. successor departments always adds additional direct labor. c. raw materials transferred out are considered 100% complete for the transferring department. d. the unit of measure should be the same in the successor department. correct: c 2. Standard costs in a process costing system are: a. reviewed at least once a year to keep the amounts current. b. computed each production period. c. computed the same way as the actual costs. d. All of the choices are correct regarding process costing systems. correct: a 3. The FIFO method does not: production.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}