Gantt Chart and .xlsx - Question 3 B Activity Analysis...

Info icon This preview shows pages 1–6. Sign up to view the full content.

Question 3 B Activity Task Duration Analysis A 1 Design B 1 Budget/Resources C 2 Machines D 6 Development E 2 Maintainance/implimentation F 1
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

Start Date End Date 0 1 1 2 2 4 4 10 10 12 12 13 A B C D E F TASK
Image of page 2
Image of page 3

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

COMPANY NAME PROJECT MANAGER 1. ANALYSIS Budget=$5,000 1.1. Location 1.1.1 Distance & time (Civilized area) (Budget=$1,000) 1.2 Research about Product 1.2.1 Manufacture 1.2.2 Their advantages 1.2.3 Budget 1.2.4 Research the market demand and competition. 1.2.4.1 Survey (Budget=$1,500 ) 1.3 Interview or review from other owners (same business). 1.4 Identify potential risk and mitigations of the product. (Budget=$2,500) 2. DESIGN Budget=$5,000 3. BUDGE Budge 3. BUDGE Budge 2.1 Define business 2.1.1 Vision and mission. 2.2 strategic plans 2.2.1 Business project draft 2.2.2 Design documents 2.2.3 Design budget 2.2.4 Deign selection (Budget=$2,000) 2.3 Project Blue prints 2.3.1 Planning 2.3.2 Plan layouts (Budget=$3,000) 3.1 determine f requirement 3.2 identify ope 3.2.1 Equipmen (Budget=$15,000) 3.3 labor cost (B 3.4 Insurance ( 3.5 Sale force a (Budget=$1,000) 3.6 Transporta (Budget=$20,000) 3.6.1 Vehicles 3.7 Tender Adj (Budget=$54,000) 3.7.1 Construct 3.7.1.1 Manage 3.7.1.2 Distribu
Image of page 4
WORK BREAKDOWN STRUCTURE
Image of page 5

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

Image of page 6
This is the end of the preview. Sign up to access the rest of the document.
  • Summer '17
  • davy

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern