Buckeye Formulation.docx

Buckeye Formulation.docx - Buckeye Manufacturing 1...

Info icon This preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Buckeye Manufacturing: 1). Decisions. Pi = the amount of P-heads produced in week i; i=1,…,8 Hi = the amount of P-heads produced in week i; i=1,…,8 IPi = inventory of P-heads at end of week i, i=1,2,…,8 IHi = inventory of H-heads at end of week i, i=1,2,…,8 Vi = 1, if a line set up for P in week i; 0, if a line set up for H in week i; i=1,…,8. Ci = 1, if changeover occurs at the beginning of week i. 2). Objective. MIN
Image of page 1
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern