Production Management 1401.pdf

Production Management 1401.pdf - PRODUCTION MANAGEMENT...

Info icon This preview shows pages 1–10. Sign up to view the full content.

View Full Document Right Arrow Icon
PRODUCTION MANAGEMENT
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Production System Definition Input Transformation Output Raw Materials Inventory Product Inventory Production System Supplier Client Flow of Materials Flow of Information
Image of page 2
Production System Options Drilling Assembly Reception & Delivery Cutting Paint Production System by Process Welding General purpose equipment grouped by similar features. Workforce is trained in processing multiple products. Each product has an independent work flow.
Image of page 3

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Production System Options Production System by Product Raw Material C A D E B Product Product 1 Raw Material B D A C Product Product 2 The distribution and sequence of equipment is determined by the product flow. Workforce is specialized in product.
Image of page 4
Production System Options High Medium Low Volume Low Medium High Variety By Product Automation By Process Customization Integrated Manufacturing Strategic Decision on Production Systems Integrated Manufacturing: Cellular Manufacturing Systems (CMS) Flexible Manufacturing Systems (FMS) Computer Integrated Manufacturing (CIM) Increased Automation Increased Flexibility
Image of page 5

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Studying Production System Raw Materials Inventory Product Inventory Production System Supplier Client Flow of Materials Flow of Information Inventory Management Procurement Forecasting Capacity Planning Production Planning Materials Planning Programming
Image of page 6
Forecasting Forecast = Use a specific method to predict the future Timing Detail Level Accuracy One Time vs Recurrent Decision Short Term vs Long Term Variables Data Available Budget Available Accepted Level of Risk Understand the Problem Analyze Data Set Forecast Goal Forecasting Process Qualitative Quantitative Cause Effect Patterns
Image of page 7

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Cause Effect Forecasting Single Relationship State Average Price Comsuption per Customer Aguascalientes 30 134 Baja California 31 112 Durango 37 136 Sonora 42 109 Nayarit 43 105 Tamaulipas 45 87 Chihuahua 50 56 Puebla 54 43 Michoacan 54 77 Campeche 57 35 Oaxaca 58 56 Morelos 58 65 Hidalgo 60 58 Guanajuato 73 49 Jalisco 88 49 Queretaro 89 39 Zacatecas 92 36 Sinaloa 97 46 Colima 100 40 Nuevo Leon 102 42 0 20 40 60 80 100 120 140 160 0 20 40 60 80 100 120 Comsuption per Customer Average Price
Image of page 8
0 20 40 60 80 100 120 140 160 0 20 40 60 80 100 120 Comsuption per Customer Average Price Simple Regression Why line would prove to be the best fit?
Image of page 9

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 10
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern