Book 2.xlsx - Before jumping into the cost analysis of the...

Info icon This preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
Developmental Cost Project manager System analyst Web designer Programmer Network engineer Developer Technical writer General Architect Trainer Disaster Recovery Operational cost Software Upgrades Software Licenses Hardware Repairs Labor: Webmaster Training Before jumping into the cost analysis of the compnay. It is essential to mentione and how much time it develop for its development. It also pertinent to mention which one needed for temporary basis. Cost associated with project from its planning to its implementation
Image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
ed the deadline of the project of how much time it will take to develop that which employees shoudl be retained for longer time period and
Image of page 2
There are four phases of project that is a. Analysis b. Planning c. Design d. Implementation A. Analysis Project Manager Permanent 175 1.3.2018 System Analyst Permanent 100 1.3.2018 Technical Writer Permanent 100 1.3.2018 B. Planning Web developer Permanent 130 10.3.2018 Programmer Permanent 140 10.3.2018 Network engineer Permanent 130 10.3.2018 General architect Permanent 175 10.3.2018 C. Design Man power Web developer Permanent 130 15.3.2018 Programer Permanent 140 15.3.2018 Network Engineer Permanent 130 15.3.2018 General Architect Permanent 175 15.3.2018 Technical Writer Permanent 100 15.3.2018 Before jumping into the cost analysis of the compnay. It is essential to mentioned the de temporary basis. This section gives detail what resources and manpower is needed under each phase of project: Status of Employees Wage rate per hour ($) Duration (Starting date)
Image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Disaster Recovery manager Permanent 100 15.3.2018 Resources softwae licensing 1800 15.3.2018 Upgraded software 2000 15.3.2018 Hardware Computer 3000 25.3.2018 Server devices 10000 25.3.2018 Tablets 5000 25.3.2018 Optical cables 2000 25.3.2018 RAMS 1000 25.3.2018 D. Implementation Traineer Permanent 100 30.3.2018 Staff 3x Permanent 10 30.3.2018
Image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern