Module 2 Exam Part 1 ACQ 202.pdf - DAU 1 of 5 https\/learn.dau.mil\/Atlas2\/html\/testengine\/TestGeneration\/test_review.jsp Module 2 Exam Part I Here is

Module 2 Exam Part 1 ACQ 202.pdf - DAU 1 of 5...

This preview shows page 1 - 3 out of 5 pages.

Module 2 Exam, Part IHere is your test result.The dots represent the choices you have made.The highlighted questions are the questions you have missed.Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y'represents visited links.Back to Status pagecontains 20 Questions1) The Test and Evaluation Master Plan (TEMP) links together, and must be consistent with, which ofthe following related program documents (Select all that apply)? [21a. Recognize how the Test andEvaluation Master Plan (TEMP) generation, staffing and approval process integrates all functional disciplinesthroughout the acquisition life cycle.]Acquisition Program Baseline (APB)Systems Threat Assessment (STA)Systems Engineering Management Plan (SEMP)Initial Capabilities Document (ICD)2) Which one of the following organizations would conduct testing on the flight controls of afighter aircraft to ensure it will meet the critical technical parameters (CTPs) derived from theCapability Development Document (CDD)? [29b. Identify the key T&E support organizations within DoD.][Remediation Accessed :N]Joint Interoperability Test Command (JITC)3) If the program is on the DOT&E Oversight List, which one of the following test and evaluation (T&E)products is required before the Full Rate Production Decision Review? [29c (2). Identify the primary Test andEvaluation (T&E) products required at each acquisition milestone.]DOT&E Report on Initial Operational Test and Evaluation (IOT&E)Live Fire T&E Waiver3) If the program is on the DOT&E Oversight List, which one of the following test and evaluation (T&E)products is required before the Full Rate Production Decision Review? [29c (2). Identify the primary Test andEvaluation (T&E) products required at each acquisition milestone.]4) Operational Measures of Effectiveness (MOE) and Measures of Suitability (MOS) are formallydocumented in the ________. [29c. Identify the primary Test and Evaluation (T&E) products required at each
Background image
Acquisition StrategyInitial Capabilities Document (ICD)Work Breakdown Structure (WBS)
Background image
Image of page 3

You've reached the end of your free preview.

Want to read all 5 pages?

  • Fall '16
  • acquisition strategy, acquisition program, IPPD, Evaluation Master Plan, Integrated Product and Process Development

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture