Data_Problem_Set_E - 210 345 450 750 540 510 Scheduled...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
PROBLEM 1 Week 1 2 3 4 5 6 7 8 9 10 11 12 Forecast 350 240 330 280 420 330 330 330 330 330 380 380 Booked orders 250 280 200 330 300 270 160 280 310 260 250 250 250 970 640 310 890 560 230 900 570 240 860 480 1000 1000 1000 1000 ATP 350 190 270 150 500 600 0 FOQ= 1000 Projected on- hand at end of week MPS replenishment starting inventory= safety stock target= b) i)No because even if we use some of the ATP from earlier weeks, there will only be 540 units available. b) ii) Yes the master schedule can accept this order because by combining the ATP from earlier weeks, there are 810 units available. Thus the master schedule can fulfill the 750 unit order.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
PROBLEM 2 a) Description Quantity b) Description Total Units Air Panther 1 0 WGA 1 1 WGA 1 1 TLA 1 1 BWR 2 3 FLA 1 1 WG 2 2 WGA 2 2 WGS 2 2 WGS 2 2 WGF 2 2 WGF 2 2 TLA 1 1 STB 2 2 STB 2 2 FIN 1 2 FIN 1 2 ELV 2 2 ELV 2 2 BDY 1 2 FLA 1 1 LND 1 2 BDY 1 2 BWR 4 3 LND 1 2 WHL 2 3 BWR 2 3 WHL 2 3 Low Level Code Low Level Code
Background image of page 2
Item: A (LT = 1 wk, SS = 0) L4L Week 1 2 3 4 5 6 7 8 MPS 0 90 70 115 150 250 180 170 MPS order releases 90 70 115 150 250 180 170 0 lead=1 Week 1 2 3 4 5 6 7 8 SS=10 Gross requirements 270
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 210 345 450 750 540 510 Scheduled receipts 200 Planned order receipts 40 345 450 750 540 510 On hand 250 180 10 10 10 10 10 10 10 Planned order releases 40 345 450 750 540 510 F lead=1 Week 1 2 3 4 5 6 7 8 FOQ=150 Gross requirements 90 70 115 150 250 180 170 SS=120 Scheduled receipts 150 Planned order receipts 150 150 300 150 150 On hand 100 160 240 125 125 175 145 125 125 Planned order releases 150 150 300 150 150 lead=2 Week 1 2 3 4 5 6 7 8 FOQ=100 Gross requirements 450 450 900 450 450 SS=90 Scheduled receipts 300 Planned order receipts 500 900 400 500 On hand 240 90 90 140 140 90 140 140 140 Planned order releases 500 900 400 500 E (2F+MPSor) H (3F)...
View Full Document

This note was uploaded on 03/19/2008 for the course BUSI 403 taught by Professor Lu during the Spring '08 term at UNC.

Page1 / 3

Data_Problem_Set_E - 210 345 450 750 540 510 Scheduled...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online