MRP sandwich .xls

MRP sandwich .xls - DAYS Lead Invento Time ry On(days hand...

Info icon This preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
DAYS 1 2 3 4 5 6 7 8 1 0 200 300 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200 300 0 0 0 0 0 0 200 300 0 0 0 0 0 200 300 0 1 SANDWICH Gross Requirements 0 0 0 0 0 200 300 0 Scheduled receipts 0 0 Projected on hand 0 0 0 0 0 0 0 0 Net Requirements 0 0 0 0 0 200 300 0 Planned Order Receipts 0 0 0 0 0 200 300 0 Planned Order Releases 0 0 0 0 200 300 0 0 1 0 Gross Requirements 0 0 0 0 0 200 300 0 Scheduled receipts 0 0 Projected on hand 0 0 0 0 0 0 0 0 Net Requirements 0 0 0 0 0 200 300 0 Planned Order Receipts 0 0 0 0 0 200 300 0 Planned Order Releases 0 0 0 0 200 300 0 0 1 100 BREAD Gross Requirements 0 0 0 0 400 600 0 0 Scheduled receipts 0 0 Projected on hand 100 100 100 100 100 100 0 0 0 Net Requirements 0 0 0 0 300 600 0 0 Planned Order Receipts 0 0 0 0 300 600 0 0 Planned Order Releases 0 0 0 300 600 0 0 0 2 HAM Gross Requirements 0 0 0 0 200 300 0 0 Scheduled receipts Projected on hand 0 0 0 0 0 0 0 0 Net Requirements 0 0 0 0 200 300 0 0 Planned Order Receipts 0 0 0 0 200 300 0 0 Planned Order Releases 0 0 200 300 0 0 0 0 1 0 CHEESE Gross Requirements 0 0 0 0 200 300 0 0 Scheduled receipts Projected on hand 0 0 0 0 0 0 0 0 Net Requirements 0 0 0 0 200 300 0 0 Planned Order Receipts 0 0 0 0 200 300 0 0 Planned Order Releases 0 0 0 200 300 0 0 0 3 300 LABEL Gross Requirements 0 0 0 0 400 600 0 0 Scheduled receipts Projected on hand 300 300 300 300 300 300 0 0 0 Net Requirements 0 0 0 0 100 600 0 0 Planned Order Receipts 0 0 0 0 100 600 0 0 Planned Order Releases 0 100 600 0 0 0 0 0 Lead Time (days) Invento ry On hand Item identification SANDWICH IN A BAG (The demand of the final product, subassembly or component) (subcontracting the final product, subassembly or component) Projected on hand (Inventory to have at the start) (what you REALLY should produce or buy) (when and how much product should be received) (release the production order to the operators or to the supplier) LABELLED BAG
Image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
MATERIAL REQUIREMENTS PLAN Lot Size 1 2 Sandwich Gross Requirements Scheduled receipts 100 1 Projected on hand Net Requirements
Image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern