Module 2 Exam, Part 1 10APR2018.docx - 1 The Test and Evaluation Master Plan(TEMP links together and must be consistent with which of the following

Module 2 Exam, Part 1 10APR2018.docx - 1 The Test and...

This preview shows page 1 - 3 out of 7 pages.

1) The Test and Evaluation Master Plan (TEMP) links together, and must be consistent with, which of the following related program documents (Select all that apply)? [21a. Recognize how the Test and Evaluation Master Plan (TEMP) generation, staffing and approval process integrates all functional disciplines throughout the acquisition life cycle.] Systems Engineering Management Plan (SEMP)Systems Threat Assessment (STA)Initial Capabilities Document (ICD)Acquisition Program Baseline (APB) 2) Which one of the following organizations would conduct testing on the flight controls of a fighter aircraft to ensure it will meet the critical technical parameters (CTPs) derived from the Capability Development Document (CDD)? [29b. Identify the key T&E support organizations within DoD.] 3) Which one of the following test and evaluation (T&E) products is required at Milestone C? [29c (2). Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.] 4) Operational Measures of Effectiveness (MOE) and Measures of Suitability (MOS) are formally documented in the ________. [29c. Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.]
Background image
5) Defense policy requires designated systems to be certified as interoperable. In part, testing to ensure interoperability is conducted to determine if the system is: [32d. Identifythe requirements for interoperability testing.] Able to provide and receive services from other systems.Configured in such a manner that the user is able to operate the system without any Consistent with commercial standards and best industry practices.
Background image
Image of page 3

You've reached the end of your free preview.

Want to read all 7 pages?

  • Fall '16
  • Acquisition Program Baseline, acquisition strategy, acquisition program, Director, Operational Test and Evaluation

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture