03/02/2018 1 OM-APP EXECUTIVE GENERAL MANAGEMENT PROGRAMME (EGMP09) Operations Management Dr. S. Venkat OM Area IIM Lucknow Noida Campus Email : [email protected]
Image of page 1

Subscribe to view the full document.

Aggregate Planning 2 OM-APP 03/02/2018
Image of page 2
Business Planning Exercise Business plan is strategic in nature and addresses the following questions: Should we meet the projected demand entirely or a portion of the projected demand? What are the implications of this decision on the overall competitive scenario and the firm’s standing in the market? How is this likely to affect the operating system and planning in other functional areas of the business such as marketing and finance? What resources should we commit to meet the chosen demand during the planning horizon? Aggregate production planning seeks to translate business plans to operational decisions 03/02/2018 OM-APP 3
Image of page 3

Subscribe to view the full document.

Business Plan Marketing Plan Financial Plan Production Plan (rough cut capacity) Master Production Schedule Materials Requirement Plan Capacity Requirement Plan Detailed Scheduling Shop Floor Control Level 1 Level 2 Level 3 Planning Hierarchies in Operations 03/02/2018 OM-APP 4
Image of page 4
Aggregate Production Planning Decision Variables: An illustration The decisions involve Amount of resources (productive capacity and labour hours) to be committed Rate at which goods and services needs to be produced during a period Inventory to be carried forward from one period to the next An example from Garment Manufacturing Produce at the rate of 9000 metres of cloth everyday during the months of January to March Increase it to 11,000 metres during April to August Change the production rate to 10,000 metres during September to December Carry 10% of monthly production as inventory during the first 9 months of production. Work on a one-shift basis throughout the year with 20% over time during July to October 03/02/2018 OM-APP 5
Image of page 5

Subscribe to view the full document.

Aggregate Units for Capacity Examples Sl. No Product Aggregate Unit of capacity 1 Phenyl Acetic Acid Metric tonnes 2 Data Entry Systems Numbers 3 Mini computer Value (ex-factory) in Rs. 4 Printed Circuit Board Square Metres 5 Alloy Iron Castings Metric tonnes 6 Cement Metric tonnes 03/02/2018 OM-APP 6
Image of page 6
Aggregate Production Planning Why is it necessary? Demand fluctuations Capacity fluctuations Difficulty level in altering production rates Production systems are complex and varying the rate of production requires prior planning and co-ordination with supplier and distributor Benefits of multi-period planning Aggregate Production Planning is done in an organisation to match the demand with the supply on a period-by-period basis in a cost effective manner 03/02/2018 OM-APP 7
Image of page 7

Subscribe to view the full document.

Targeted Demand to be fulfilled Arriving at effective Period-by-period Demand to be met Arriving at Period-by-Period Supply Schedules - Actual period-by-period Supply Schedules Forecasting Alternatives for Modifying demand Alternatives for Modifying supply Aggregate Production Planning Framework 03/02/2018 OM-APP 8
Image of page 8
Alternatives for managing demand
Image of page 9

Subscribe to view the full document.

Image of page 10
You've reached the end of this preview.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern