Module 2.1 Study Guide.docx - 1 The Test and Evaluation Master Plan(TEMP links together and must be consistent with which of the following related

Module 2.1 Study Guide.docx - 1 The Test and Evaluation...

This preview shows page 1 - 3 out of 8 pages.

1) The Test and Evaluation Master Plan (TEMP) links together, and must be consistent with, which of the following related program documents (Select all that apply)? [21a. Recognize how the Test and Evaluation Master Plan (TEMP) generation, staffing and approval process integrates all functional disciplines throughout the acquisition life cycle.]Acquisition Program Baseline (APB)Systems Engineering Management Plan (SEMP)Initial Capabilities Document (ICD)Systems Threat Assessment (STA)2) Which one of the following organizations would conduct testing on the flight controls of a fighter aircraft to ensure it will meet the critical technical parameters (CTPs) derived from the Capability Development Document (CDD)? [29b. Identify the key T&E support organizations within DoD.]3) Which one of the following test and evaluation (T&E) products is required at Milestone C? [29c (2). Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.]
Background image
(EOA)DOT&E Report on Initial Operational Test and Evaluation (IOT&E)4) The operational effectiveness and operational suitability questions thatmust be addressed during Operational Test and Evaluation (OT&E) to assessthe system's capability to perform its mission are called ___________. [29c.Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.][Remediation Accessed :N]
Background image
Image of page 3

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture