Mod 2 Part 1 Exam 1 Attempt 1.pdf - Page 1 of 5 Module 2 Exam Part I Here is your test result.The dots represent the choices you have made The

Mod 2 Part 1 Exam 1 Attempt 1.pdf - Page 1 of 5 Module 2...

This preview shows page 1 - 3 out of 5 pages.

Module 2 Exam, Part I Here is your test result.The dots represent the choices you have made. The highlighted questions are the questions you have missed. Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y' represents visited links. Back to Status page contains 20 Questions 1) The Test and Evaluation Master Plan (TEMP) is mandated by DoD policy and must be updated periodically to ensure that it stays current as the program evolves through the life cycle. [21a. Recognize how the Test and Evaluation Master Plan (TEMP) generation, staffing and approval process integrates all functional disciplines throughout the acquisition life cycle.] True False 2) Who would certify the interoperability performance of a command and control system used by both the Army and the Navy? [29b. Identify the key T&E support organizations within DoD.] 3) Which one of the following test and evaluation (T&E) products is required at Milestone C? 4) The operational effectiveness and operational suitability questions that must be addressed during Operational Test and Evaluation (OT&E) to assess the system's capability to perform its mission are called ___________. [29c. Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.] Critical Operational Issues (COI) Critical Technical Parameters (CTP) Measures of Performance (MOP) Page 1 of 5 7/11/2018
Image of page 1
Key Performance Parameters (KPP)
Image of page 2
Image of page 3

You've reached the end of your free preview.

Want to read all 5 pages?

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture