BSBPMG512 Summative 2 - Q1.docx - BSBPMG512 Manage Project...

This preview shows page 1 - 2 out of 2 pages.

BSBPMG512 – Manage Project Time Summative Assessment 2 1. Design a WBS for the scenario project which outlines the project in its entirety. WORK BREAKDOWN STRUCTURE Project Name New Department IT System Date Project Number A001. Document Number 001.01 Project Manager John Smith Project Owner/Client State Government Department.
WBS Code /ID Component Name Brief Description 1. Project New Department IT System - A001. 1.1 Major Deliverable Design of the overall system architecture 1. 1. 1. Control Account AJC Ltd. 1 . 1 . 1 . 1 Design Intranet Facility Design an intranet facility that will enable the departments 3 main divisions to communicate and report internally. Access levels need to be departmental with overall access for higher management levels. 1 . 1 . 1 . 2 . Design Online Facility Design of an online facility that will reduce labour costs, enable fast and automatic transactions, enable feedback and be low risk to theft. 1 . 1 . 1 . 3 . Design Internal Access Portal Design of a portal to integrate information, people and processes

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture