Module 4 Exam Here is your test result.The dots represent the choices you have made. The highlighted questions are the questions you have missed. Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y' represents visited links. Back to Status pagecontains 21 Questions1) The detailed tasks required to be completed and identified in the time-based Integrated Master Schedule (IMS) are directly linked to what element of the event-based Integrated Master Plan (IMP)? [4.2.1 - Relate the relationship of the Integrated Master Plan (IMP) to the Integrated Master Schedule (IMS).]CriteriaAccomplishmentEventAssignment 2) Which of the following does the last step of the Schedule Development and Management Process, Monitor and Control Program Schedules, entail? (Select two that apply.) [4.3.1 - Select the six steps for the schedule development and management process.]Determining the sequencing of tasksManaging change to the approved schedulesAssigning resources to each taskIdentifying and evaluating schedule variations
3) Looking at a program's task list, you realize that the "Preliminary Design" task cannot start until a vendor has been selected. This is an example of which type of task dependency? [4.3.2 - Given a task relationship scenario, identify the standard type of dependencies or relationships between schedule activities.]Finish-to-Start (FS) Finish-to-Finish (FF)Start-to-Start (SS)Start-to-Finish (SF)4) After starting the Schedule Development and Management Process by identifying a comprehensive list of program tasks, assigning identifiers, and including additional information such as potential constraints, what sort of product should the program manager (PM) expect to have? [4.3.3 - Identify the end result of the identification of schedule tasks step.]Page 1 of 5DAU6/13/2018
A visual representation of the task list showing the breakdown of work packages into tasks and the listing of all tasks in a task listA visual representation of the task list showing the sequencing of each task and the listing of all tasks in a work packageA visual representation of the task list showing all resources needed for each task and the listing of all tasks in a control accountA visual representation of the task list showing all available float for each task and the listing of all tasks in a task list

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture