Exam 2 Part 1 (08 Aug 2016) 1st Try.pdf - DAU Page 1 of 5 Module 2 Exam Part I Here is your test result.The dots represent the choices you have made The

Exam 2 Part 1 (08 Aug 2016) 1st Try.pdf - DAU Page 1 of 5...

This preview shows page 1 - 3 out of 5 pages.

Module 2 Exam, Part I Here is your test result.The dots represent the choices you have made. The highlighted questions are the questions you have missed. Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y' represents visited links. Back to Status page contains 18 Questions 1) The Test and Evaluation Master Plan (TEMP) links together, and must be consistent with, which of the following related program documents (Select all that apply)? [21a. Recognize how the Test and Evaluation Master Plan (TEMP) generation, staffing and approval process integrates all functional disciplines throughout the acquisition life cycle.] Initial Capabilities Document (ICD) Systems Engineering Management Plan (SEMP) Systems Threat Assessment (STA) Acquisition Program Baseline (APB) 2) Who would certify the interoperability performance of a command and control system used by both the Army and the Navy? [29b. Identify the key T&E support organizations within DoD.][Remediation Accessed :N] 3) Which one of the following test and evaluation (T&E) products is required at Milestone C? [29c (2). Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.] [Remediation Accessed :N] Operational Assessment (OA) Results Live Fire Test and Evaluation (LFT&E) Report Page 1 of 5 DAU 8/8/2016
Image of page 1
Early Operational Assessment (EOA) DOT&E Report on Initial Operational Test and Evaluation (IOT&E) 4) Operational Measures of Effectiveness (MOE) and Measures of Suitability (MOS) are formally documented in the ________. [29c. Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.] Test and Evaluation Master Plan (TEMP) Acquisition Strategy Initial Capabilities Document (ICD) Work Breakdown Structure (WBS)
Image of page 2
Image of page 3

You've reached the end of your free preview.

Want to read all 5 pages?

  • Fall '16
  • Project Management, acquisition program, Integrated Product and Process Development, Navy Operational Test and Evaluation Activity, Director, Operational Test & Evaluation

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture