Abstract - Abstract This study is to determine the...

This preview shows page 1 out of 1 page.

Abstract This study is to determine the Minimization of Delays in the Production Department of M5, Mart, Inc. Number of productive work, number of unproductive work, total number of work, productive work rate and unproductive work rate was used to determine the number of the delay in M5, Mart Inc. Based on the findings, the highest total number of productive work is 1552, while the number of unproductive work is 328 for the total number of 1880. The productive work rate got 82.55 percent while the unproductive work rate is 17.45 percent. The researchers used the work sampling method to record the productivity and unproductivity of the workers in the whole working hours
Image of page 1
  • Winter '17
  • Ishikawa diagram, Seven Basic Tools of Quality, Quality control tools, productive work, Mart Inc

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern