lab 2.pdf - SCHOOL OF CIVIL ENGINEERING ASSIGNMENT REPORT...

This preview shows page 1 - 3 out of 5 pages.

SCHOOL OF CIVIL ENGINEERING ASSIGNMENT/ REPORTCOVER SHEET For group assignments please use table below to fill in the names of all students Student Name: Student Number: Unit of Study Name: Assignment Name/Number: (Optional): This assignment took me/us < 3 hrs 3 - 5 hrs 5 - 8 hrs 8 - 12 hrs 12 hrs + Academic Honesty DeclarationI/We certify that: 1.I/We have read and understood the Academic Board PoliciesonAcademic HonestyandAcademic Dishonesty,available at ;2.I/We understand that failure to comply with the relevant Academic Board Policies can leadto the University commencing proceedings against me/us for potential studentmisconductunder Chapter 8 of the University of Sydney By-Law 1999 (as amended);3.This Work is substantially my/our own, and to the extent that any part of this Work is not my/ourown I/wehave indicated that it is not my/our own by Acknowledging the Source of that part orthose parts of theWork.For individual assignments the declaration is to be signed by the individual student.For group assignments the declaration is to be signed all members of the group.Family Name First Name SID Number Signature Date Created by Civil Engineeringon24/05/2010;
VL2 Buoyancy lab report 6/9/2018 Zhenyu Zhang 470201185 P a g e | 1Data and plot Buoyancy force vs depth of immersed ball Table 1. Experimental data of buoyancy force variation with depth of immersed ball Fluid Density (kg/m^3) Ball Density (kg/m^3) Ball Diameter (m) Fluid Surface to Ball Bottom (m) Force Sensor Reading (N) Depth of ball into fluid

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture