Breakdown a project 1- PBS: Product Breakdown Structure a. A hierarchy of products 2- WBS: Work Breakdown Structure a. A hierarchy of work 3- CBS: Cost Breakdown Structure a. Budget 4- OBS: Organization Breakdown Structure a. Base on organization WBS Note: the objective(s) must be well defined then A project can be broken into several work packages Second level is based on the Phases Second level is based on Departmental organization Second Level can be breakdown based on Product (Modular Devices such as the keyboard, cell phone) Develop Project A Styling Feasibility Design Manufactur Distribute Project A Concept Development Design Test Production Sale Hardware Project A Software Test/Equi Operational Mat Training Mat Advertisement
Second level can be a combination of the above three methods. Phase Organization Product Any combination and the above Work Package Activities No matter which one you use, the work package must be divided into activities.

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture