SubUrban.docx - Work breakdown structure: Level1 Level2...

This preview shows page 1 - 2 out of 2 pages.

The preview shows page 1 - 2 out of 2 pages.
Work breakdown structure:Level1Level2Level3Foundation1.1Excavate1.1.1 Dig1.1.2 Level1.2Frame1,2.1 Ballon frame1.2.2 space frame1.2.3 Portal frame1.3 Concrete1.3.1 pour Concrete1.3.2 Frost Resistant1.3.3 Permanent WoodExterior2.1 Frame2.1.2 shingles2.1.2 gutters2.2 Roof2.2.1 gable2.2.2flat roof2.2.3 Mansard Roof2.3 Paint2.4 WindowsInterior3.1Plumbing3.1.1 Drainage3.1.2 hot and cold lines
3.2walls3.2.1 Frame3.2.2 Insulation
End of preview. Want to read all 2 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Spring
Professor
eric harter
Tags
Project Management, UCI race classifications, Structural system

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture