CSM 702 2.pdf - Home Construction Review Interim assignment#2 Home Construction Review Vijay Rajamanickam 301048895 Management of a Construction Project

CSM 702 2.pdf - Home Construction Review Interim...

This preview shows page 1 - 3 out of 4 pages.

Home Construction Review Interim assignment #2 Home Construction Review Vijay Rajamanickam 301048895 Management of a Construction Project CSM 702 -101 Henry Levy
Background image
Home Construction Review McNaughton Homes House Construction The McNaughton Homes House Construction is an informative video about the construction practice followed for an individual two storey house in Canada. OBSERVATIONS I analyzed the video and have made a list of observations the house construction practice in Canada which can be categorized into individual divisions of work. -Digging the foundation:This is the foremost process in any construction with the usage of excavators for removing the ground soil and prevented by shoring to avoid slope failure -Footers: Footers forms the foundation which supports transfers the load of the building towards the ground soil and forms a layer for the sub-structure. -Basement walls: The basement walls are made up of reinforced concrete. It gives the structural stability, durability and enables proper backfilling -Building subfloor: Subfloor forms the base for framing the roof and walls. The sill plateis placed on the
Background image
Image of page 3

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture