100% in 7.2 mins.pdf - Finished Title Scrum Open Points 30...

This preview shows page 1 - 4 out of 15 pages.

2/10/2019 Finished. 1/15 Correctly answered Incorrectly answered Missed correct option Question 1 of 30 A) B) C) D) Title: Scrum Open Points: 30 out of 30 Percentage: 100% Duration: 00:07:20 Date started: Sun 10th Feb 2019 5:03am Date finished: Sun 10th Feb 2019 5:10am Feedback Congratulations! Your score on the Open assessment demonstrates you know some Scrum basics. Scrum on, Ken Schwaber Statistics by Category All Questions 30 Correct 0 Incorrect When does a Development Team member become the sole owner of a Sprint Backlog item? Correct answer: B) You chose: B) Note: This question displayed answer options in random order when taking this Test. At the Sprint planning meeting. Never. All Sprint Backlog Items are "owned" by the entire Development Team, even though each one may be implemented by an individual development team member. Whenever a team member can accommodate more work. During the Daily Scrum.
Image of page 1

Subscribe to view the full document.

2/10/2019 Finished. 2/15 Question 2 of 30 A) B) C) D) E) Question 3 of 30 A) B) C) D) Points: 1 out of 1 Feedback Sprint Backlog and all of its items are collectively owned by the Development Team. No individual team member can claim ownership over an item as this would block communication and collaboration. The maximum length of the Sprint Review (its time-box) is: Correct answer: B) You chose: B) Note: This question displayed answer options in random order when taking this Test. 2 hours. 4 hours for a monthly Sprint. For shorter Sprints it is usually shorter. As long as needed. 1 day. 4 hours and longer as needed. Points: 1 out of 1 Feedback Sprint Review is a four-hour time-boxed meeting for one-month Sprints. For shorter Sprints, the event is usually shorter. When is a Sprint over? Correct answer: D) You chose: D) Note: This question displayed answer options in random order when taking this Test. When all Product Backlog items meet their definition of done. When the Product Owner says it is done. When all the tasks are completed. When the time-box expires. Points: 1 out of 1 Feedback The duration of a Sprint is fixed and cannot be shortened or lengthened.
Image of page 2
2/10/2019 Finished. 3/15 Question 4 of 30 A) B) Question 5 of 30 A) B) C) D) Question 6 of 30 It is mandatory that the product increment be released to production at the end of each Sprint. Correct answer: B) You chose: B) True False Points: 1 out of 1 Feedback The product increment should be usable and releasable at the end of every Sprint, but it does not have to be released. Which statement best describes a Product Owner's responsibility? Correct answer: A) You chose: A) Note: This question displayed answer options in random order when taking this Test. Optimizing the value of the work the Development Team does.
Image of page 3

Subscribe to view the full document.

Image of page 4

{[ snackBarMessage ]}

Get FREE access by uploading your study materials

Upload your study materials now and get free access to over 25 million documents.

Upload now for FREE access Or pay now for instant access
Christopher Reinemann
"Before using Course Hero my grade was at 78%. By the end of the semester my grade was at 90%. I could not have done it without all the class material I found."
— Christopher R., University of Rhode Island '15, Course Hero Intern

Ask a question for free

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern