MOD 2 Exam Part 1.pdf - DAU Page 1 of 5 Module 2 Exam Part I Here is your test result.The dots represent the choices you have made The highlighted

MOD 2 Exam Part 1.pdf - DAU Page 1 of 5 Module 2 Exam Part...

This preview shows page 1 - 3 out of 8 pages.

Module 2 Exam, Part I Here is your test result.The dots represent the choices you have made. The highlighted questions are the questions you have missed. Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y' represents visited links. Back to Status page contains 20 Questions 1) As part of the DoD-recommended Test and Evaluation Master Plan (TEMP) format, which of the following documents is considered to be one of the four parts of the TEMP that serve as a starting point for organizing a successful T&E program? [Recognize how the Test and Evaluation Master Plan (TEMP) generation, staffing and approval process integrates all functional disciplines throughout the acquisition life cycle.] Test and Evaluation StrategyAcquisition StrategyIntegrated Master PlanLogistics Funding Resource Summary 2) Which one of the following organizations would conduct testing on the flight controls of a fighter aircraft to ensure it will meet the critical technical parameters (CTPs) derived from the Capability Development Document (CDD)? [Identify the key T&E support organizations within DoD.][Remediation Accessed :N] 3) Which one of the following test and evaluation (T&E) products is required at Milestone B? [Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.][Remediation Accessed :N] Identification of LRIP QuantitiesOperational AssessmentNo T&E products are required at MS BWaiver of Military Equipment Program Description4) What do operational testers evaluate to determine the degree to which a system is usable in its intended environment, e.g., reliable, supportable, maintainable, and transportable? [Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.] Page 1 of 5 DAU 9/28/2016
Image of page 1
5) Joint Interoperability Test Command (JITC) has primary responsibility for developmental test and evaluation (T&E) functions throughout DoD. [Identify the requirements for interoperability testing.][Remediation Accessed :N]
Image of page 2
Image of page 3

You've reached the end of your free preview.

Want to read all 8 pages?

  • Fall '16
  • Air Force Operational Test, Navy Operational Test and Evaluation, Test and Evaluation, Director, Operational Test and Evaluation

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture