ACQ 202 Module 2 Exam Part I.pdf - DAU Page 1 of 5 Module 2 Exam Part I Here is your test result.The dots represent the choices you have made The

ACQ 202 Module 2 Exam Part I.pdf - DAU Page 1 of 5 Module 2...

This preview shows page 1 - 3 out of 5 pages.

Module 2 Exam, Part I Here is your test result.The dots represent the choices you have made. The highlighted questions are the questions you have missed. Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y' represents visited links. Back to Status page contains 20 Questions 1) The Test and Evaluation Master Plan (TEMP) links together, and must be consistent with, which of the following related program documents (Select all that apply)? [21a. Recognize how the Test and Evaluation Master Plan (TEMP) generation, staffing and approval process integrates all functional disciplines throughout the acquisition life cycle.] Acquisition Program Baseline (APB)Systems Engineering Management Plan (SEMP)Systems Threat Assessment (STA)Initial Capabilities Document (ICD) 2) Which one of the following organizations would evaluate measures of effectiveness (MOEs) to determine how well a munitions system can perform its mission? [29b. Identify the key T&E support organizations within DoD.] 3) If the program is on the DOT&E Oversight List, which one of the following test and evaluation (T&E) products is required before the Full Rate Production Decision Review? [29c (2). Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.] 4) The operational effectiveness and operational suitability questions that must be addressed during Operational Test and Evaluation (OT&E) to assess the system's capability to perform its mission are called ___________. [29c. Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.] Page 1 of 5 DAU 8/20/2018
Image of page 1
Critical Operational Issues (COI) Critical Technical Parameters (CTP) Measures of Performance (MOP) Key Performance Parameters (KPP) 5) Joint Interoperability Test Command (JITC) has primary responsibility for developmental test and evaluation (T&E) functions throughout DoD.
Image of page 2
Image of page 3

You've reached the end of your free preview.

Want to read all 5 pages?

  • Fall '16
  • Project Management, Operational Test Agencies, Director, Operational Test & Evaluation, Marine Corps Operational Test

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture